• Latest
Tata Steel commissions India’s largest blast furnace at Kalinganagar plant in Odisha

Tata Steel commissions India’s largest blast furnace at Kalinganagar plant in Odisha

21 September 2024
Hindalco’s red to green initiative: ‘Torang Vatika’ inaugurated at Muri

Hindalco’s red to green initiative: ‘Torang Vatika’ inaugurated at Muri

18 April 2026
Delimitation-linked amendment bill fails in Lok Sabha; 278 Ayes, 211 Noes

Nari Shakti Vandan Adhiniyam: From Parliamentary Defeat to Political Destiny

18 April 2026
Veteran legal luminary of Jamshedpur PN Gope passes away at 85

Veteran legal luminary of Jamshedpur PN Gope passes away at 85

18 April 2026
Jharkhand BJP demands rollback of electricity tariff hike

BJP announces protests in Ranchi on April 19–20 over RIMS student gang-rape case

18 April 2026
Jharkhand Heatwave: Daltonganj sizzles at 42.6°C, Jamshedpur crosses 40°C

Heatwave likely in Jharkhand as temperatures cross 42°C

18 April 2026
Jharkhand Bureaucracy: Srinivasan, among four IAS officers, shifted  

Jharkhand reshuffles DCs before Census, raises concerns

18 April 2026
The Jharkhand Story
  • Advertise with us
  • Breaking
  • Governance
  • Politics
  • Education
  • Crime
  • Judiciary
  • Climate & Wildlife
  • Industries & Mining
Sunday, April 19, 2026
  • Home
  • Election
  • Politics
  • Judiciary
  • Governance
  • Crime
  • Industries & Mining
  • Health
  • Tribal Issues
  • Education
  • Sports
  • More
    • Life Style
    • Jobs & Careers
    • Tourism
    • Opinion
    • Infrastructure
    • Science & Tech
    • Climate & Wildlife
    • Corruption
    • News Diary
No Result
View All Result
The Jharkhand Story
No Result
View All Result
Home Breaking

Tata Steel commissions India’s largest blast furnace at Kalinganagar plant in Odisha

Jharkhand Story by Jharkhand Story
21 September 2024
in Breaking, Industries & Mining
Tata Steel commissions India’s largest blast furnace at Kalinganagar plant in Odisha

default

Share on FacebookShare on Twitter

PINAKI MAJUMDAR

 

Jamshedpur, Sept 21: Tata Steel on Friday successfully commissioned India’s largest blast furnace at its Kalinganagar plant in Odisha.

With a total investment of Rs 27,000 crore, the Phase II expansion at Kalinganagar will take the total capacity at the site from 3 million tonnes per annum (MTPA) to 8 MTPA.

The new facility was inaugurated by T. V. Narendran, CEO and Managing Director, Tata Steel, in the presence of senior officials of the company.

Enhanced production capabilities

The new blast furnace will significantly boost the plant’s overall production capabilities, allowing Tata Steel to meet the growing demands of various industries, including automotive, infrastructure, power, shipbuilding, and defence.

It will also provide advantages in specific areas like oil and gas, lifting & excavation, and construction.

Also Read- JMM, Congress, RJD are speed breakers of Jharkhand’s development: Rajnath Singh

With the Phase II expansion, Odisha has emerged as the largest investment destination in India for Tata Steel, with a total cumulated investment of over Rs 100,000 crore in the last 10 years.

On this occasion, T. V. Narendran, said, “The commissioning of India’s largest blast furnace at Kalinganagar is a momentous occasion for the steel industry, setting new benchmarks in capacity, technology, and sustainability. A key enabler of socio-economic development in the region, the expansion not only strengthens Tata Steel’s position as a leader in high-end, value-added steel segments but also showcases our advanced engineering prowess. It underscores our commitment to boosting private investment in India, aligning with the nation’s vision for self-reliance and sustainable industrial growth. On behalf of Tata Steel, I thank the Government of Odisha for their unwavering support and applaud the collective efforts of our employees, suppliers & vendor partners, and all other stakeholders in enabling this significant milestone.”

Advanced features of new furnace

The new blast furnace, with a volume of 5,870 m3, is equipped with state-of-the-art features for long campaign life and an eco-friendly design to optimise the steelmaking process.

This blast furnace will utilise four top combustion stoves, a first in India, along with two preheating stoves for optimum specific fuel consumption in hot metal production. In a first for Tata Steel, a dry gas cleaning plant has been installed to maximise energy recovery from by-product gas.

Also Read- Atishi takes oath as Chief Minister of Delhi

Tags: India’s largest blast furnaceKalinganagar plantOdishaTata Steel
ShareTweetShareSendSendShare
Next Post
Jharkhand CM Hemant Soren pays tribute to late journalist Ravi Prakash

Jharkhand CM Hemant Soren pays tribute to late journalist Ravi Prakash

  • Advertise with us
  • Breaking
  • Governance
  • Politics
  • Education
  • Crime
  • Judiciary
  • Climate & Wildlife
  • Industries & Mining
Mail us : thejharkhandstory@gmail.com

© 2025 The Jharkhand Story

No Result
View All Result
  • Home
  • Election
  • Politics
  • Judiciary
  • Governance
  • Crime
  • Industries & Mining
  • Health
  • Tribal Issues
  • Education
  • Sports
  • More
    • Life Style
    • Jobs & Careers
    • Tourism
    • Opinion
    • Infrastructure
    • Science & Tech
    • Climate & Wildlife
    • Corruption
    • News Diary